§ 78-137. Deposit of estimated costs when relocation constructed by city—Required; amount.
Latest version.
The applicant for any water main relocation to be constructed by the city shall make a deposit with the city in an amount equal to the estimated total cost of such relocation, and such estimated total cost shall include all costs for materials, labor, transportation, equipment and other costs, but shall include no charge for engineering, administration and other overhead costs, as defined in sections 78-135 and 78-136.